Nearby alerts
Applies from Tue 18 Mar 2025, 8.04am to Fri 11 Apr 2025, 8.05am. Last reviewed: Tue 18 Mar 2025, 8.17am
Other planned events: Meroo Head Campground Walking Track Maintenace
Maintenance of the walking track that access campsites 1-10 at Meroo Head campground will be underway from Monday 31 March to Friday 11 April. There may be obstacles, machinery and short delays during this time. Proceed with caution and follow the directions of signs and NPWS staff.
Affects 1 park and 1 location nearby. Show list
Applies from Thu 13 Mar 2025, 3.46pm to Fri 4 Apr 2025, 3.47pm. Last reviewed: Fri 21 Mar 2025, 10.10am
Other planned events: Delays on Meroo Point and Blackbutt Road
Roadworks will be underway on Meroo Point Road and Blackbutt Road from Tuesday 18 March to Friday 4 April 2025. The road may be uneven and slippery during this time. Drive safely and follow the directions of roadwork signs and NPWS staff.
Affects 1 park and 8 locations nearby. Show list
Applies from Thu 13 Mar 2025, 3.35pm. Last reviewed: Thu 13 Mar 2025, 3.46pm
Other planned events: Giriwa Walking Track Maintenance
Track maintenance works will be underway on Giriwa Walking Track from Friday 14 March to Friday 4 April 2025. There may be obstacles, delays and temporary closures along the track during this time. Proceed along the walking track carefully and follow the directions of signs and NPWS staff.
Affects 1 park and 3 locations nearby. Show list
Applies from Tue 9 Jul 2024, 11.00am. Last reviewed: Wed 19 Mar 2025, 7.49am
Safety alerts: Cullendulla Beach erosion
Cullendulla Beach is changing shape from the impacts of coastal erosion.
During high tide, walking access via the beach into Cullendulla Creek Nature Reserve from the carpark on Myamba Parade may be restricted by the ocean.
While in the reserve, visitors should continue to monitor conditions and time their walk with a lower tide.
Tide predictions for Batemans Bay are found on the Bureau of Meteorology website.
Affects 1 park and 1 location nearby. Show list